Project Client Consultant Work Involved
91 Routine mechanised maintenance of Pabbo-Atiak-Nimule road (69km) Ministry of Works & Transport Ministry of Works & Transport * Heavy grading, culvert installation. * Repair and reconstruction of stone pitching. * Shoulder repair.
Completed in 2006
92 Remedial works at Kaabong and Abim hospitals Ministry of Health Ministry of Health Construction of new buildings and rehabilitation of existing buildings.
Completed in 2006
93 Routine mechanised maintenance of Wesunire-Kakoge road (14km), Nakabira-Nawantale (12km), & Nakawe-Kisakye road (17km) Ministry of Works & Transport Ministry of Works & Transport Heavy grading, culvert installation.
Completed in 2006
94 Proposed construction of Stanbic Bank Kakira branch building Kakira Sugar Limited Kakira Sugar Limited Construction of bank building.
Completed in 2006
95 Port road (140km) Ministry of Works & Transport Ministry of Works & Transport Heavy grading, regravelling, culverts laying and storm water drain.
Completed in 2005
96 Construction and rehabilitation of selected PTP centres in Uganda Ministry of Education & Sports Icon Institute - GET/JBG Construction of new and rehabilitation of existing buildings for classrooms, dormitories, kitchen, and workshops.
Completed in 2005
97 Construction of laboratories and libraries in selected secondary schools, Lot II Ministry of Education & Sports Arch Design Architects & Engineers Construction of new buildings for laboratories and libraries.
Completed in 2005
98 Caneyard paving at Kakira Sugar Works, Phase I, II & III Kakira Sugar Works Kakira Sugar Works Limited Caneyard paving.
Completed in 2005
99 Routine mechanised maintenance of Natete-Nakawuka-Kasanje/Kisubi road (38km) Ministry of Works & Transport Ministry of Works & Transport Grading and regravelling.
Completed in 2005
100 Construction of Arua Power Plant Mantrac Uganda Limited Mantrac Uganda Limited Construction of foundation for generator, floor slabs for generator platform, booster and oil lube bases etc.
Completed in 2004
  • ‹‹
  • 10 of 18
  • ››

Navigation

  • Ongoing Projects

Quick Links

  • Working in Uganda
  • Featured Projects
  • Webmail
  • Construction of a 70 bed private wing in Nsambya hospital

Projects

  • All Projects
  • Featured Projects
  • Ongoing Projects

Madhvani Group Logo 

 

Copyright © 2025. Excel Construction Ltd. All rights reserved.